Company News

  • Characteristics of FRP Pultruded Grating

    · Light weight: Its weight is one quarter of steel gratings; easy for carrying, which reduce the carrying cost. · Good mechanical property: Resin content is 35%; fiberglass content is 65%, which increase the rate between strength and weight. · Aging resistance: UV absorption agent and polyester s...
    Read more
  • The detail specification of FRP Pultruded Grating

    FRP Pultruded Grating has most of the characteristics of molded FRP grating, but it also has some obvious different points. The most important one is high fiberglass content in load-carrying direction (65%-70%).So, compared with molded FRP grating, pultruded grating has obvious advantages on larg...
    Read more
  • Bangladesh  CHITTAGONG hydropower project

    June 12th, 2018, INTERRY manufactured GRP pipes for Bangladesh  CHITTAGONG hydropower project are all successful acceptance and start delivering.  The contract’s time of delivery is about 10 weeks, as a prerequisite,to insure the quality of productions, we fulfilled the production in advanc...
    Read more
  • South-to-North water diversion office visit to Interry

    On 22nd April,2018. State South-to-North water diversion official come to company to inspect the quality of the 3rd unit project construction, accompanied by the General Manager Xin Zhuang.
    Read more
  • Interry double layer oil tank fill in gaps, built the nationwide largest SF double layer oil tank base

    Aug 7th, 2014, China Daily the seventh edition reported on Interry double layer oil tank. Recently, the 200 units double layer oil tanks that Interry manufactured for China Petroleum & Chemical branch were delivery official, meet the requirements of the transport of dangerous goods. Interry S...
    Read more
  • LG Chemical head office, LG Interry chairman Piaocaijun visit our company

    July 2, 2014, LG Chemical head office, LG Interry chairman Piaocaijun visit our company. Piaocaijun gave high evaluation for LG Interry  achievements on the first year of founded.
    Read more
  • Interry contracted oversea hydropower Project

    May 2,2011, Interry  signed the contract of supplying GRP pipes for BAHIA BLANCA HYDROPOWER PROJECT- ARGENTINA.The contract includs supplying NY1000,NY1100 GRP pipes and related GRP fittings,total sum in the contract:USD251,000,and the time of delivery is 50 work days.
    Read more